Grid assembly for the 5CX1500B and 3CX800A7

Winding of mesh filaments for the 3CX3000A7 and 4CX10,000D

Winding of mesh filaments for the 3CX3000A7 and 4CX10,000D

A few of Svetlana's Metal Ceramic tube assembly team

Environmentally controlled storage cabinets keep tube parts clean and dust free

Mesh filaments stored in dust-free cabinets ready for assembly

3CX10,000A7 assembly of grid, filament, getters and base. Tooling assures proper alignment before welding

Assembly of fins on large power tubes in the 3CX10,000 and 3CX15,000 series

Furnace tanks apply intense heat for brazing tube parts into assemblies

Quality control check of the 4CX1500A grid/filament assembly

Vacuum pumping equipment for metal/ceramic power tubes

Quality control room for assurance of welding integrity

4CX350A tube testing

Burning tetrodes in or "training" 4CX1600B

Close up of previous picture showing individual 4CX1600B tetrodes with power applied

Socket assembly quality inspection

back to selection

Go to
Glass Tube Production